The Challenge:
Providing a bespoke cage system, secured to the existing flooring, with lockable metal doors for PPE and chemicals to be distributed to a tight deadline.
![EUQF7519](https://metafabs.com/wp-content/uploads/2021/06/EUQF7519.jpg)
![EUQF7519](https://metafabs.com/wp-content/uploads/2021/06/EUQF7519.jpg)
Strategy and Outcome
Miramar Engineering have engaged Metafabs on a number of projects over recent years with great success.
The works have ranged from the manufacturing & installation of a bespoke cage system for one of our key clients, through to the manufacture and installation of an insulated ventilation system for a food factory extension.
At all times, the Metafab senior management have been professional providing clear concise information in a timely manner inclusive detailed drawings. The quality of products produced has been second to none; with one our key clients commenting “The cage looks really good. Hopefully, in the future, site can invest & replace the others”.
We look forward to having a continued working relationship with Metafabs and highly recommend them to anyone looking for a positive thinking, diverse and flexible fabrication and installation company.
![CNES Frame](https://metafabs.com/wp-content/uploads/2021/06/COPI8402.JPG-510x382.jpg)
![Hinkley Point C](https://metafabs.com/wp-content/uploads/2021/06/IMG_5871_2-510x382.jpeg)
![Greencore Bow PPE & Chemical Cage](https://metafabs.com/wp-content/uploads/2021/06/EUQF7519-510x382.jpg)
![Southsea WWII Landing Craft](https://metafabs.com/wp-content/uploads/2021/06/LCT_11.0-510x382.jpg)
![T24 Framework Telecoms Tower](https://metafabs.com/wp-content/uploads/2021/06/IMG_9726-510x382.jpg)
![Wallington Square](https://metafabs.com/wp-content/uploads/2021/06/Picture-510x382.jpg)
![Institute of Cancer Research](https://metafabs.com/wp-content/uploads/2021/06/After_10-1-510x382.jpg)